During the crazy summer of 2021,
the cost of doing construction rose at a
ridiculous rate.
2x4s tripled in price.
Concrete ceased to be available.
And trusses were back ordered for months.
But somehow, this happened:
In a space that was not really being used,
our clients imagined a storage area for
fun thing like a project car and workshop.
After much planning and designing,
a hole was dug, and stem walls formed up.
Normally, concrete would then be poured.
However, this year... it took a little longer.
But nonetheless, a concrete foundation finally happened.
Framing the walls:
View from behind:
The interior:
Walls from the front:
Coming together inside!
Prepping for stucco:
And done!
No comments:
Post a Comment